Getting Ready to Paint, Spring 2000 |
|
|
Here you see the place where the first baseboard heater was removed (below
the window). Once it was out, Marty filled in the hole from the wiring with a drywall
patch (the darker gray part by the floor).One of our biggest concerns in this project is protecting the floor. We worked too hard on it last summer to mess it up now. So we taped brown paper down on the entire floor. It has been a challenge to keep Ziggy from shredding it before the project is complete. |
Here's another patch -- this one fills in the
hole where the control for the electric heat used to be. Every room in the house has one
or two of these heaters and one of these controls beside the door. We're going to be
getting rid of these things for a long time to come. You can also see the test of the yellow paint in this picture -- although it looks a little darker here than it does in real life. |